| Commercial
Service SCHEDULE "C" (Code 06) AVAILABILITY Available for single phase and three phase service at standard City voltage below 15,000 volts. The standard voltage available depends upon the location, character and size of customer's load. This information can be furnished to the customer at the City's Light Department offices. MONTHLY RATE Demand Charge Reactive Kilovolt-Ampere Charge Energy Charge MINIMUM CHARGE $3.05 per kilowatt based on one-half (½) of the highest kilowatt capacity required in the preceding eleven months, but not less than $7.67 per month. PURCHASE POWER ADJUSTMENT Adjustment applies to all kilowatt hours served under this schedule. TERM One year or longer. DETERMINATION OF CAPACITY Kilowatt Demand Capacity required is the highest metered demand established over a thirty (30) minute interval per billing period. Kilowatts will be computed to the nearest one-half (½) kilowatt. When the City must install special transformers or other equipment to provide service for welding loads or other highly fluctuating loads, then the City shall have the option of measuring the kilowatts required by instantaneous meters and 50% of the values so found shall be used in determining the kilowatts used for billing. Reactive Kilovolt-Ampere Demand Capacity required is the highest metered demand established over a thirty (30) minute interval per billing period. Reactive meters will be installed when the customer's kilowatt demand exceeds 200 kilowatts. Reactive kilovolt amperes will be computed to the nearest one-half (½) reactive kilovolt ampere. GENERAL Service supplied is subject to the rules and regulations of the City covering the supply of electric service, and rules and regulations for meter and service installations of the City, as filed with the Public Service Commission. SUPPLY OF MORE THAN ONE VOLTAGE The City will supply to a customer for a building or a group of buildings on a single location energy under this schedule through two meters, for single-phase lighting service and three-phase power service, when the meters are adjacent and the City's cost of facilities is not increased. In such cases, the City will combine the meter readings for energy consumed and capacity required. This shall apply only to those customers receiving said combined billings prior to June 1, 1984. All new customers; customers who change service locations; customers who relocate, change or renew their service entrance facilities will receive a single service and single meter. |
|||